Construction of secure channels along the federal pipeline infrastructure. Equipment supply and last-mile.
Provide continuous secure connectivity along trunk oil pipelines from the Baltic to the Far East with channel redundancy.
Backbone nodes along the route, GOST-encrypted secure channels, equipment supply and installation at PJSC Transneft facilities.
A trunk secure network covering Central, Volga, Urals, Siberian and Far Eastern districts; channels are continuously expanded as new sites are commissioned.
Rapid deployment of secure communication channels in Crimea. One-channel rollout time: 1–2 weeks. Built the only gigabit Anapa-Taman-Kerch radio relay link, independent from Ukraine — proprietary infrastructure.
Construction of population-alerting system segments. Crisis-management and dispatch centres, equipment supply, last-mile and channel provisioning.
Construction of a distributed federal secure network for the FCS. Equipment supply and last-mile construction.